Industrial Projects



{short description of image}
 

Electrical Cost: $389,000.00

Scope: Install power and control wiring for a Co-Generation plant containing eight ( 8 ) Caterpillar Natural gas generators. Interface the chilling system towers, computer control cabinets and transfer equipment to allow unattended automatic transfers from local power grid to Co-Generation system.




 

Electrical Cost: $525,000.00

Scope: Engineer and install an electrical distribution system that allows the flexibility to relocate and incorporate various pieces of equipment. The distribution system incorporates I-Line distribution panels that feed several runs of buss duct at either side of the plant. This system allows the flexibility for load size and equipment location.




 

Electrical Cost: $65,000.00

Scope: Engineer service, lighting and power requirements for speculative precast industrial tenant building. The office space is designed to facilitate office cubicles, private offices and any computer and networking requirements. The warehouse, however, has been engineered electrically to adjust to any heavy manufacturing or light industrial usage.